Skip to documentation
CCARTEL HQ

Product documentation

Cartel HQ Help Center

Set up your project, connect Telegram and learn each tool step by step.

Production verified 30 September 2026. Guides identify plan, permission and verification limits.

Launch Control & Network

Understand the launch lifecycle and next action

Follow the available action and its prerequisite instead of skipping stages.

Who can use it
Project launch operators
Where to find it
Launch Control → select launch → Overview
Before you start
  • A launch record
On this page

Current lifecycle

ItemDetails
DraftA saved launch preparation record.
AnnouncedLaunch announcement stage after leaving Draft.
Watchlist openEligible members can opt in; countdown delivery can still be unarmed.
Launch approachingCountdown delivery becomes armed according to schedule and eligibility.
Contract pendingOfficial registration can be offered only when required deployment evidence is verified.
Official contract registeredThe launch has an evidence-bound official contract record. This alone sends no messages.
LiveThe eligible live transition has completed. Do not equate an editable label with a trade or liquidity transaction.
CompletedThe launch lifecycle has reached its completion state.

Advance carefully

  1. Open Overview and read the current stage and next action.
  2. If an action is blocked, read the specific missing prerequisite and use the linked control to address it.
  3. Review the action’s effects before confirming. The lifecycle rail is informational rather than a set of unrestricted stage buttons.
  4. Verify the new state and then decide whether a separate communication action is needed.

Scope

Preparing schedules and watcher communications does not bypass verified contract or mainnet gates. Owner-only test and deployment tools are not public customer launch features. Cartel AI Operator and liquidity operations are not documented as available public tools.